There is a football field in Johannesburg, South Africa, which has lights installed, but these lights have never been on

It caused a lot of kids to play football in the dark.

 

"In 2019, after the completion of the green space upgrading and transformation in Jinggang, South Africa, there will be not only a football field, but also a protective net and lights installed on it around the football field." South African customer Mr pachick said that although there are lights in the green space of Beijing and Hong Kong in South Africa, and many fitness areas have lights, the lights installed on the protection network of this football field have never been on. "Many children only have time to play football at night, because there are no lights, they all play football in the dark."

latest company case about MF Case - South Africa Stadium Light Project  0

South African customer Mr pachick said that since the football field in the green space is equipped with lighting, it should be able to light up at night. Only in this way can it be convenient for people who like to play football, especially for children.

After receiving the help from Mr pachick, a South African customer, Ming Feng lighting engineer came to the green space of Jinggang in South Africa and saw that there were many lights installed on the protective net of the football field, but they didn't light up at night.

 

After that, Ming Feng Lighting Engineer contacted Mr pachick and found Mr Klaus in the greening management center of South Africa Landscaping Center. He said that the lighting in the Beijing Hong Kong Green Space in South Africa should be in the charge of the municipal urban lighting management office.

 

Soon after, the city lighting management office told Ming Feng Lighting Engineer and Mr pachick that the staff of the city lighting management office went to the scene to find out that the lighting of the football field was not installed by the city lighting management office, and the installation unit was not clear“ After investigation, it was found that there was a potential safety hazard in the lighting of the football field, which could not be powered on for the time being. "

latest company case about MF Case - South Africa Stadium Light Project  1

"In order to facilitate the night fitness of the surrounding citizens, we have decided to re plan and design the lighting of the football field and other areas in the Beijing Hong Kong Green Space in South Africa, so as to meet not only the lighting needs of the visiting citizens, but also the fitness needs of the citizens as far as possible." The city lighting management office said that some lamps and lanterns installed by individuals without permission in the green space will be demolished and redesigned because they do not meet the safety requirements. After completion, they will provide better night lighting effect for the public on the premise of ensuring safety.

 

 

Ming Feng Lighting factory successfull finished the project in South Africa for the soccer stadium light, client are supersied by see what has changed comparing with the old lamps, it saves electricity bill significantly.

 

According to the person in charge of the upgrading and reconstruction project of the stadium of Johannesburg Sports Center (domestic games), on the evening of June 22, the construction party debugged the lifting system of eight light poles, of which two lights were on for test. After another lifting system debugging in the daytime on June 23, all the eight lights were on at 6:30 pm on June 23. Different from the installation of lighting lamps in the main stadium of Johannesburg Olympic Sports Center on a 40 meter high raceway, the stadium of the sports center is equipped with eight "Big Mac" lifting lamp poles, each 53 meters high (51 meters of pole body, plus 2 meters of lightning rod), weighing 19 tons. The lifting was completed in May this year, and each set of lamps and lamp frame weighs 4 tons, Such a volume of 8 lifting high-definition sports lighting pole design is rare in the country.

 

Ming Feng Lighting factory successfull finished the project in South Africa for the soccer stadium light, client are supersied by see what has changed comparing with the old lamps, it saves electricity bill significantly.

latest company case about MF Case - South Africa Stadium Light Project  2

 

At the scene, the staff pressed the button in the control room, and the lamps and brackets on each lamp post rose slowly, and rose to the top in about 20 minutes. Then eight groups of lighting lamps were on together, and the lights in the stadium instantly cut through the night sky and were as bright as day. Against the backdrop of the night, eight groups of lighting lamps stand side by side at the four corners of the stadium, just like the two eyes of robots in science fiction movies, with a strong sense of technology.

 

 

According to the person in charge of the upgrading and reconstruction project of the stadium of Johannesburg Sports Center (domestic games), on the evening of June 22, the construction party debugged the lifting system of eight light poles, of which two lights were on for test. After another lifting system debugging in the daytime on June 23, all the eight lights were on at 6:30 pm on June 23. Different from the installation of lighting lamps in the main stadium of Johannesburg Olympic Sports Center on a 40 meter high raceway, the stadium of the sports center is equipped with eight "Big Mac" lifting lamp poles, each 53 meters high (51 meters of pole body, plus 2 meters of lightning rod), weighing 19 tons. The lifting was completed in May this year, and each set of lamps and lamp frame weighs 4 tons, Such a volume of 8 lifting high-definition sports lighting pole design is rare in the country.

latest company case about MF Case - South Africa Stadium Light Project  3

 

The stadium of Johannesburg Sports Center was built in 1997. The traditional metal halide lamps have been used for many years. There are many problems such as insufficient illumination, excessive energy consumption and so on. In order to meet the needs of domestic football games, the designer has customized a set of systematic LED lighting solutions to meet the lighting needs of domestic football games HD TV relay level. A total of 296 sets of mf-air forceled1500w professional sports lighting lamps are installed on 8 poles, 32 sets of led600w lamps are used for auditorium lighting, and 24 sets of led900w lamps are used for emergency lighting. Compared with the traditional lamps before, the newly installed LED lamps have the advantages of energy saving, environmental protection, long service life and sufficient illumination.

 

latest company case about MF Case - South Africa Stadium Light Project  4

At the same time, equipped with intelligent dimming system, it can switch with one button to meet the needs of different modes. In order to meet the high-definition broadcast needs of the domestic games in Johannesburg, it also takes into account the multi-mode needs of other comprehensive events and national fitness. The precise lighting control technology makes the lighting mode more accurate, flexible and energy-saving. The patented glare control technology provides a more comfortable environment for athletes and audiences.

 

latest company case about MF Case - South Africa Stadium Light Project  5

At the same time, considering that Johannesburg is close to the coast and is affected by typhoon all the year round, in order to ensure the safety of the stadium in typhoon season, the design adopts the 8-pole lifting light pole scheme“ At present, the newly-built large stadiums in China either install the lights on the raceway or use fixed light poles. The lifting lighting scheme with 8 poles and 53 meters in height adopted by the stadium of Johannesburg sports center is rare in China. " The person in charge said that next, the construction party will carry out two days of lighting debugging, and all the projects will be jointly completed and accepted next week. The upgrading and reconstruction project of the stadium of the Johannesburg Sports Center (sub venues of the National Games) is about to be completed